PLS COUPLING

The PLS Coupling automatically locks a traverse rail of an XY-system to a fixed track. This way the hoist unit can leave the XY system and enter other rooms. The PLS Coupling is equipped with our unique Sensor-motion technology.

  • Technical
  • Sensor Motion

Technical specifications

Usage Connects traverse rail XY to solid rail system
Connecting rail 55x65 mm (1383) only 22,5 mm above track
Operation Sensor-activated
Compatibility PLS transit coupling must only be used in combination with PLS rail profile
Weight and materials 4,7 kg. Aluminium and galvanised steel, standard powder-coated in RAL 9010
Electrical specs Power supply: 24 V, max 3,5 A. Use only in combination with PLS approved power supply. Activation by PLS Sensor-Motion technology
Accesoiries Safety-lock (standard) 1032. Stabilizer (optional) 6109/6110
Model number 1025
Marking CE-marked as a part of the PLS rail system,In accordance with: EN: 10535:2006 Directive 93/42/EEC
The PLS Rail Coupling is equipped with the unique Sensor-Motion technology. Because of this technology the coupling is extremely easy to operate. No wall switches or rail contacts but smart sensors detecting the hoist and activate a motion to change direction or connect segments of track. E ectively this means not only more comfort, also more attention for the patient instead of operating a track system.